Tuesday, February 11, 2014



Rig Derrick Load Calculation 
by drillingformulas.com


The drilling line is reeved over a set of crow block and down to another set of sheaves known as travelling block. The hook connected to travelling block is used to suspend the drilling load. One end of drilling line is wound onto the drawworks and this line is called “Fast Line”. Other end of the drilling line is tied into an anchor point on the rig floor and this line is named as “Dead Line”. The drilling line is reeved around the blocks several times in order to meet required load.  Check this link for details and sample calculation.

http://www.drillingformulas.com/rig-derrick-load-calculation/
derrick Load Calculation 1

No comments:

Post a Comment